Production Parameters
Any field updates the others automatically: Takt = Work Time ÷ Demand
units
s
= 6.67 h
s / unit
60
s / unit takt time
🔄 Flow Control Strategy
Controls how WIP moves between stations — directly affects inventory, lead time and throughput.
Add Task
cycle time
Variation (optional)
comma-sep
Task List
| ID | Mean (s) | Variation | Predecessors | Pos. Weight |
|---|
📋
No tasks yet. Add tasks or load an example.
Line Balance Analysis
Station Assignments
Variation Analysis
Balance Chart
Space-Time Matrix
Stations lined up horizontally — drag tasks between stations
Unassigned Pool
← drag tasks here to unassign
Linear Scheduling Simulation
Units flow vertically through stations over time. Diagonal lines = station throughput.
Simulation Results
Run simulation to see results.
🗂 KB Impact & Recommendation