INDUSTRIAL ENGINEERING STUDIO
① Setup
② Analysis
③ Space-Time
④ Simulation
Production Parameters
Any field updates the others automatically: Takt = Work Time ÷ Demand
units
s = 6.67 h
s / unit
60
s / unit takt time
🔄 Flow Control Strategy
Controls how WIP moves between stations — directly affects inventory, lead time and throughput.
Add Task
cycle time
Variation (optional)
comma-sep
Task List
ID Mean (s) Variation Predecessors Pos. Weight
📋

No tasks yet. Add tasks or load an example.

Line Balance Analysis
Station Assignments
Variation Analysis
Balance Chart
Space-Time Matrix
Stations lined up horizontally — drag tasks between stations
Unassigned Pool ← drag tasks here to unassign
Linear Scheduling Simulation
Units flow vertically through stations over time. Diagonal lines = station throughput.
🗂 Kanban: 0 units/gap edit ①
👷 Workforce:
Simulation Results
Run simulation to see results.
🗂 KB Impact & Recommendation